Past Projects

Cherry Creek Flood Recovery-Greenstone and Rodeo Structure Replacement

Cherry Creek Flood Recovery-Greenstone and Rodeo Structure Replacement

Cherry Creek Flood Recovery-Greenstone and Rodeo Structure Replacement

Cherry Creek Flood Recovery-Greenstone and Rodeo Structure Replacement

Cherry Creek Flood Recovery-Greenstone and Rodeo Structure Replacement

Cherry Creek Flood Recovery-Greenstone and Rodeo Structure Replacement

Heart Creek No.2 Bridge and Approaches

Heart Creek No.2 Bridge and Approaches

Heart Creek No.2 Bridge and Approaches

Heart Creek No.2 Bridge and Approaches

Heart Creek No.2 Bridge and Approaches

Heart Creek No.2 Bridge and Approaches

Swansea Bridge

Highway 3/95 Moyie River at Swansea Bridge No. 0764 and Approaches Project No. 23690-0000

Construction of a new two lane, single span 36-metre-long bridge with Type 5 prestressed concrete I – girders, steel pipe pile foundations, cast-in-place concrete abutments, deck and parapets. Work also includes approximately 1 kilometre of asphalt paved approaches and embankment construction, riprap installation in the river channel and removal and disposal of the existing Moyie River at Swansea Bridge No. 0764. Construction of turtle habitat.

Porto Rico Bridge

  

Porto Rico Bridge No. 0465 Replacement, Porto Rico Ymir Road

Project No. 23293-0000

Construction of a new single lane, clear span, 25-metre-long bridge with 900mm deep prestressed concrete box stringers, cast-in-place concrete abutments and steel traffic barrier. Included construction of approximately 150 metres of asphalt paved approaches, rip rap installation in the channel and removal and disposal of the existing Porto Rico Bridge No. 0465 superstructure and concrete substructure in its entirety.

Irishman Creek Bridge

  

Highway No. 93, Irishman Creek Bridge No. 1476 & Approaches

Project No. 23538-0000

Construction of a new two-lane, single span, 17 metre long bridge with 700 mm deep prestressed concrete box stringers, cast-in-place concrete abutments, deck and parapets. Included construction of approximately 615 metres of asphalt paved approaches, as well as removal and disposal of the existing Irishman Creek Bridge. 

Luxor Creek Bridge

  

Highway No. 95, Luxor Creek Bridge No. 8486

Project No. 23572-0001 

The existing 3300mm CSP Culvert and fill was replaced with a two lane, three span, 70.5-meter-long bridge consisting of; pre-stressed concrete box stringers, cast in-place concrete pile caps, open ended steel pipe piles, and cast in place concrete deck and parapets. 


Little Sand Creek Bridge

Donald Bridge

Corbin Overhead Bridge